Our Project Highlights
Over the past 20 years, E-eye has been involved in numerous clienteles from medium to large scale organizations.

Menara Telekom
- Implementation of Pumps Retrofit
- Savings of 93 % of pumping kW consumption was achieved with the same load condition.
- Average pumping kW consumption was reduced from 400 kW to average of 100 kW with the running tonnage around 3000 ton.
- At present condition supply temperature has improved to 9.7 ˚C (before : 12.4 ˚C ) daytime and 8.5˚C (before : 8.6 ˚C ) at night time.

Telekom Exchange Building, Jalan Raja Chulan
- Implementation of Total Energy Efficiency Retrofit and Energy Improvement at the HVAC plant.
- Average savings of RM 100,000 per month (average of RM 1,200,000 per annum) from the average electricity bill of RM 350,000 per month.
- Existing system was reduced from 8 kW/ton to 0.6 kW/ton without compromising the required cooling load.

StatsChipPAC Malaysia
- Implementation of AHU Retrofit and Building Monitoring System.
- Average savings of RM 350,000 per annum with an investment of RM 900,000.
- Savings of 80% of AHU consumption with additional of 180RT on top of the original design tonnage.
- Reducing AHU operating cost by more than 30%.

WESTERN DIGITAL, MALAYSIA
- Total Energy Retrofit implemented.
- Awarded the world most Efficient Building in 1996.
- Average savings of more than 45% .

UNIVERSITI TEKNOLOGI MALAYSIA (UTM), SKUDAI, JOHOR
- Implementation of Energy Efficiency Retrofit
- Power (kW) savings of 39%.
- Lighting intensity Watt/m² reduction of 70%
- kWh Savings = RM 22,839.50 per month
- Demand Savings = RM 5,501.57 per month
- Total Monthly Savings = RM 28,341.07 per month
- Annual Savings = RM 340,092.84 per annum

GRAND HYATT HOTEL, SINGAPORE
- Implementation of Energy Efficiency Retrofit and Chiller Plant System Optimization Services.
- Savings of S$ 1,141,000 per annum with an investment of S$ 2,559,000.
- System Efficiency = 0.58 kW/ton (improvement of ±45.22%)
- Chiller Efficiency = 0.485 kW/ton (improvement of ±35.36%)
- AHU Efficiency = 0.029 kW/ton (improvement of ±90%)
- Chilled Water Pump Efficiency = 0.031 kW/ton (improvement of ±79.86%)
- Condenser Water Pump Efficiency = 0.035 kW/ton (improvement of ±74.07%)

PRIME MINISTER OFFICE (PMO), PUTRAJAYA
- Installation of Power Quality/ Harmonic Filter Device and Power Quality (PQ) Improvement at Prime Minister Office (PMO), Putrajaya.
- Total Harmonic Distortion (Amps) Improvement from 46.26% to 7.12%
- Total Harmonic distortion (Volts) Improvement from 1.59% to 1.05%
Other project
YEAR | CLIENT | DESCRIPTION |
2017 | Samsung Electronics Sdn Bhd | Full Detailed Energy Audit at Samsung Electronics Sdn Bhd |
HEKTAR Group | Chiller Energy Audit at Wetex Parade, Muar | |
Multiplex Packaging Sdn Bhd | Full Detailed Energy Audit at Multiplex Packaging Sdn Bhd | |
CAMFILL | Energy Audit at CAMFIL Malaysia Sdn Bhd | |
GBI | Energy Audit at Pharmaniaga, Perak | |
HEKTAR Group | Chiller Energy Audit at Mahkota Parade, Melaka | |
HEKTAR Group | Chiller Energy Audit at Central Square, Kedah | |
HEKTAR Group | Chiller Energy Audit at Subang Parade | |
GBI | Chiller Energy Audit at Pharmaniaga, Bangi | |
Jabatan Kerja Raya (JKR) | Chiller Energy Audit at KKR | |
Sutera Intrajaya Sdn Bhd | Chiller Energy Audit at HUSM | |
2016 | Telekom Malaysia Jalan Raja Chulan | Maintenance and monitoring services for Energy Saving Chiller and control System at Telekom JRC |
EUROMOBIL Sdn Bhd | Full Detailed Energy Audit at Euromobil Berhad | |
EON Berhad | Full Detailed Energy Audit at EON Berhad | |
Menara Telekom Malaysia (ES2) | To Supply, Install and Upgrade ES2 Existing Monitoring System | |
2015 | Prime Minister office (PMO) | Installation Of Power Quality/ Harmonic Filter Device. |
CH2M HILL Singapore Pte. Ltd. | Energy Audit at Semiconductor Plant in Freescale KualaLumpur | |
CH2M HILL Singapore Pte. Ltd. | Energy Audit at Semiconductor Plant in Freescale Tian Jin, China | |
Western Digital (M) Sdn Bhd | Chilled Water Optimization at WDM P6 | |
Sutera Intrajaya Sdn Bhd | Hospital Temerloh, Pahang | |
Aruss Synergy Sdn Bhd | Electrical apportionment and Energy audit (UPM) | |
Jana Tanmia (M) Sdn Bhd | Energy audit at Hospital Kulai, Johor | |
2014 | Western Digital (M) Sdn Bhd | P1L1 BEST LAB, Western Digital (M) |
Operon Malaysia Sdn Bhd | Maybank – Measurements & Consultancy Work (Selangor Branch’s – 100 sites) (Federal Territory – 78 sites) | |
Greengineers Sdn Bhd | Chiller Audit, at Factory in Batang Berjuntai | |
Climate Edge Consult Sdn Bhd | Parcel E8,E2,E12,E11,E9,E14,E15,E13, Putrajaya | |
CNNS Technasco Sdn Bhd | AEON Big Subang | |
Stagno Tech Sdn Bhd | Ibu Pejabat Polis Bukit Aman, Kuala Lumpur | |
Jangka Pretasi Sdn Bhd | Bangunan Perbendaharaan 2, (2G8), Putrajaya | |
2014 | Mizura Sdn Bhd | MOF Building Audit, Bangunan Perbendaharaan (2G2), Putrajaya |
KFM Holdings Sdn Bhd | ‘HIGH PERFORMANCE GREEN BUILDING’, Kompleks Perdana Putra, Putrajaya -installation of new set of power quality/harmonic filter device ( ‘the Works’) | |
Stagno Tech Sdn Bhd | Jabatan Kastam Diraja Malaysia, (2G1AB), Putrajaya | |
2013 | KFM Holdings sdn bhd | Prime Minister Office, Putrajaya |
KFM Holdings sdn bhd | Dataran Maybank (Etiqa), Kuala Lumpur | |
KFM Holdings sdn bhd | Etiqa Twins Building, Kuala Lumpur | |
KFM Holdings sdn bhd | Etiqa Academy , Kuala Lumpur | |
CNNS Technasco sdn bhd | Menara Maybank, Kuala Lumpur | |
CNNS Technasco sdn bhd | Maybank Academy, Bangi | |
CNNS Technasco sdn bhd | Maybank Data Centre, Shah Alam | |
Telekom (M) R&D sdn bhd | Bangunan Kementerian Kemajuan Luar Bandar & Wilayah (4G8), Putrajaya | |
Telekom (M) R&D sdn bhd | Bangunan Kastam & Akuantan (2G1A & 2G1B), Putrajaya | |
Greengineers sdn bhd | Ampang Park Shopping Complex, Kuala Lumpur | |
2012 | Telekom (M) R&D sdn bhd | Bangunan Kementerian Komunikasi & Multimedia (4G9), Putrajaya |
Mizura sdn bhd | Parcel C, Putrajaya (7 buildings) | |
Semasa Services sdn bhd | Bangunan EPF, Kuala Lumpur | |
Telekom (M) R&D sdn bhd | Bangunan Kementerian Luar Bandar & Wilayah (4G8), Putrajaya | |
Telekom (M) R&D sdn bhd | Bangunan Kementerian Perumahan & Kerajaan Tempatan (4G10), Putrjaya | |
2011 | Global Facilities Management Sdn Bhd | Bangunan Sultan Iskandar, Custom & Immigration Quarantine (CIQ), Johor |
2010 | Alpha Eight Tech sdn bhd | KL Sentral & 1 Sentral, Kuala Lumpur |
Prince Hotel | Prince Hotel, Kuala Lumpur | |
Park Royal Hotel | Park Royal Hotel, Penang | |
Seri Pacific Hotel | Seri Pacific Hotel, Kuala Lumpur | |
2009 | Radical Box sdn bhd | TM Building, Kulim |
2008 | Nestle | Nestle Plant, Chembong |
2006 | Green Productivity Foundation | Taiwan Airport, Chiang Kai Shek, Taiwan |
2003 | Nagase & Co Ltd | Sony Factory, Kokubu, Japan |
2000 | Agilent Technologies sdn bhd | Agilent Plant, Penang |
Singapore General Hospital | College of Medicine Building, Singapore |