{"id":7937,"date":"2018-01-10T16:48:56","date_gmt":"2018-01-10T16:48:56","guid":{"rendered":"http:\/\/www.eeye.com.my\/main\/?page_id=7937"},"modified":"2018-01-10T17:11:55","modified_gmt":"2018-01-10T17:11:55","slug":"our-client","status":"publish","type":"page","link":"https:\/\/www.eeye.com.my\/main\/our-client\/","title":{"rendered":"Our Client"},"content":{"rendered":"[vc_row fullwidth=&#8221;true&#8221; fullwidth_content=&#8221;false&#8221; css=&#8221;.vc_custom_1515594223110{padding-top: 60px !important;padding-bottom: 60px !important;background-color: #ffffff !important;}&#8221;][vc_column][mk_fancy_title size=&#8221;40&#8243; font_family=&#8221;none&#8221; responsive_align=&#8221;left&#8221;]Our Project Highlights[\/mk_fancy_title][vc_empty_space][vc_column_text css=&#8221;.vc_custom_1515602662768{margin-bottom: 0px !important;}&#8221;]Over the past 20 years, E-eye has been involved in numerous clienteles from medium to large scale organizations.[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7917&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515602901565{margin-bottom: 0px !important;}&#8221;]\n<div><strong>Menara Telekom<\/strong><\/div>\n<ul>\n<li>Implementation of Pumps Retrofit<\/li>\n<li><strong>Savings of<\/strong>\u00a0<strong>93 % of pumping kW<\/strong>\u00a0consumption was achieved with the same load condition.<\/li>\n<li>Average pumping kW consumption was reduced from\u00a0<strong>400 kW\u00a0<\/strong>to average of\u00a0<strong>100 kW\u00a0<\/strong>with the running tonnage around 3000 ton.<\/li>\n<li>At present condition supply temperature has improved to 9.7 \u02daC (before : 12.4 \u02daC ) daytime and 8.5\u02daC (before : 8.6 \u02daC ) at night time.<\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7917&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603012375{margin-bottom: 0px !important;}&#8221;]<strong>Telekom Exchange Building, Jalan Raja Chulan<\/strong><\/p>\n<ul>\n<li>Implementation of Total Energy Efficiency Retrofit and Energy Improvement at the HVAC plant.<\/li>\n<li>Average savings of\u00a0<strong>RM 100,000\u00a0<\/strong>per month (average of\u00a0<strong>RM 1,200,000<\/strong>\u00a0per annum) from the average electricity bill of RM 350,000 per month.<\/li>\n<li>Existing system was reduced from\u00a0<strong>8 kW\/ton\u00a0<\/strong>to<strong>\u00a00.6 kW\/ton<\/strong>\u00a0without compromising the required cooling load.<\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7916&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603074168{margin-bottom: 0px !important;}&#8221;]<strong>StatsChipPAC Malaysia<\/strong><\/p>\n<ul>\n<li>Implementation of AHU Retrofit and Building Monitoring System.<\/li>\n<li>Average savings of\u00a0<strong>RM 350,000 per annum\u00a0<\/strong>with an investment of RM 900,000.<\/li>\n<li>Savings of 80% of AHU consumption with additional of 180RT on top of the original design tonnage.<\/li>\n<li>Reducing AHU operating cost by more than 30%.<\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7919&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603114586{margin-bottom: 0px !important;}&#8221;]<strong>WESTERN DIGITAL, MALAYSIA<\/strong><\/p>\n<ul>\n<li>Total Energy Retrofit implemented.<\/li>\n<li>Awarded the world most Efficient Building in 1996.<\/li>\n<li>Average savings of more than\u00a0<strong>45% .<\/strong><\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7918&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603170386{margin-bottom: 0px !important;}&#8221;]<strong>UNIVERSITI TEKNOLOGI MALAYSIA (UTM), SKUDAI, JOHOR<\/strong><\/p>\n<ul>\n<li>Implementation of Energy Efficiency Retrofit<\/li>\n<li>Power (kW) savings of 39%.<\/li>\n<li>Lighting intensity Watt\/m\u00b2 reduction of 70%<\/li>\n<li>kWh Savings = RM 22,839.50 per month<\/li>\n<li>Demand Savings = RM 5,501.57 per month<\/li>\n<li>Total Monthly Savings =\u00a0<strong>RM 28,341.07 per month<\/strong><\/li>\n<li>Annual Savings =\u00a0<strong>RM 340,092.84 per annum<\/strong><\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7943&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603228858{margin-bottom: 0px !important;}&#8221;]<strong>GRAND HYATT HOTEL, SINGAPORE<\/strong><\/p>\n<ul>\n<li>Implementation of Energy Efficiency Retrofit and Chiller Plant System Optimization Services.<\/li>\n<li>Savings of\u00a0<strong>S$ 1,141,000 per annum\u00a0<\/strong>with an investment of S$ 2,559,000.<\/li>\n<li>System Efficiency = 0.58 kW\/ton (improvement of \u00b145.22%)<\/li>\n<li>Chiller Efficiency = 0.485 kW\/ton (improvement of \u00b135.36%)<\/li>\n<li>AHU Efficiency = 0.029 kW\/ton (improvement of \u00b190%)<\/li>\n<li>Chilled Water Pump Efficiency = 0.031 kW\/ton (improvement of \u00b179.86%)<\/li>\n<li>Condenser Water Pump Efficiency = 0.035 kW\/ton (improvement of \u00b174.07%)<\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7944&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515603603866{margin-bottom: 0px !important;}&#8221;]<strong>PRIME MINISTER OFFICE (PMO), PUTRAJAYA<\/strong><\/p>\n<ul>\n<li>Installation of Power Quality\/ Harmonic Filter Device and Power Quality (PQ) Improvement at Prime Minister Office (PMO), Putrajaya.<\/li>\n<li>Total Harmonic Distortion (Amps) Improvement from 46.26% to 7.12%<\/li>\n<li>Total Harmonic distortion (Volts) Improvement from 1.59% to 1.05%<\/li>\n<\/ul>\n[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][mk_fancy_title size=&#8221;40&#8243; font_family=&#8221;none&#8221; responsive_align=&#8221;left&#8221;]Other project[\/mk_fancy_title][mk_table]\n<table width=\"664\">\n<tbody>\n<tr>\n<td width=\"64\"><b>YEAR<\/b><\/td>\n<td width=\"208\"><b>CLIENT<\/b><\/td>\n<td width=\"392\"><b>DESCRIPTION<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"64\">2017<\/td>\n<td width=\"208\">Samsung Electronics Sdn Bhd<\/td>\n<td width=\"392\">Full Detailed Energy Audit at Samsung Electronics Sdn Bhd<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">HEKTAR Group<\/td>\n<td width=\"392\">Chiller Energy Audit at Wetex Parade, Muar<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Multiplex Packaging Sdn Bhd<\/td>\n<td width=\"392\">Full Detailed Energy Audit at Multiplex Packaging Sdn Bhd<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">CAMFILL<\/td>\n<td width=\"392\">Energy Audit at CAMFIL Malaysia Sdn Bhd<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">GBI<\/td>\n<td width=\"392\">Energy Audit at Pharmaniaga, Perak<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">HEKTAR Group<\/td>\n<td width=\"392\">Chiller Energy Audit at Mahkota Parade, Melaka<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">HEKTAR Group<\/td>\n<td width=\"392\">Chiller Energy Audit at Central Square, Kedah<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">HEKTAR Group<\/td>\n<td width=\"392\">Chiller Energy Audit at Subang Parade<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">GBI<\/td>\n<td width=\"392\">Chiller Energy Audit at Pharmaniaga, Bangi<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Jabatan Kerja Raya (JKR)<\/td>\n<td width=\"392\">Chiller Energy Audit at KKR<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Sutera Intrajaya Sdn Bhd<\/td>\n<td width=\"392\">Chiller Energy Audit at HUSM<\/td>\n<\/tr>\n<tr>\n<td width=\"64\">2016<\/td>\n<td width=\"208\">Telekom Malaysia Jalan Raja Chulan<\/td>\n<td width=\"392\">Maintenance and monitoring services for Energy Saving Chiller and control System at Telekom JRC<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">EUROMOBIL Sdn Bhd<\/td>\n<td width=\"392\">Full Detailed Energy Audit at Euromobil Berhad<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">EON Berhad<\/td>\n<td width=\"392\">Full Detailed Energy Audit at EON Berhad<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Menara Telekom Malaysia (ES2)<\/td>\n<td width=\"392\">To Supply, Install and Upgrade ES2 Existing Monitoring System<\/td>\n<\/tr>\n<tr>\n<td width=\"64\">2015<\/td>\n<td width=\"208\">Prime Minister office (PMO)<\/td>\n<td width=\"392\">Installation Of Power Quality\/ Harmonic Filter Device.<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">CH2M HILL Singapore Pte. Ltd.<\/td>\n<td width=\"392\">Energy Audit at Semiconductor Plant in Freescale KualaLumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">CH2M HILL Singapore Pte. Ltd.<\/td>\n<td width=\"392\">Energy Audit at Semiconductor Plant in Freescale Tian Jin, China<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Western Digital (M) Sdn Bhd<\/td>\n<td width=\"392\">Chilled Water Optimization at WDM P6<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Sutera Intrajaya Sdn Bhd<\/td>\n<td width=\"392\">Hospital Temerloh, Pahang<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Aruss Synergy Sdn Bhd<\/td>\n<td width=\"392\">Electrical apportionment and Energy audit\u00a0\u00a0 (UPM)<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Jana Tanmia (M) Sdn Bhd<\/td>\n<td width=\"392\">Energy audit at Hospital Kulai, Johor<\/td>\n<\/tr>\n<tr>\n<td width=\"64\">2014<\/td>\n<td width=\"208\">Western Digital (M) Sdn Bhd<\/td>\n<td width=\"392\">P1L1 BEST LAB, Western Digital (M)<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Operon Malaysia Sdn Bhd<\/td>\n<td width=\"392\">Maybank\u00a0 &#8211; Measurements &amp; Consultancy Work (Selangor Branch&#8217;s &#8211; 100 sites) (Federal Territory &#8211; 78 sites)<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Greengineers Sdn Bhd<\/td>\n<td width=\"392\">Chiller Audit, at Factory in Batang Berjuntai<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Climate Edge Consult Sdn Bhd<\/td>\n<td width=\"392\">Parcel E8,E2,E12,E11,E9,E14,E15,E13, Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">CNNS Technasco Sdn Bhd<\/td>\n<td width=\"392\">AEON Big Subang<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Stagno Tech Sdn Bhd<\/td>\n<td width=\"392\">\u00a0Ibu Pejabat Polis Bukit Aman, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"64\"><\/td>\n<td width=\"208\">Jangka Pretasi Sdn Bhd<\/td>\n<td width=\"392\">\u00a0Bangunan Perbendaharaan 2, (2G8), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2014<\/td>\n<td width=\"258\">Mizura Sdn Bhd<\/td>\n<td width=\"312\">MOF Building Audit, Bangunan Perbendaharaan (2G2), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">KFM Holdings Sdn Bhd<\/td>\n<td width=\"312\">\u2018HIGH PERFORMANCE GREEN BUILDING\u2019, Kompleks Perdana Putra, Putrajaya -installation of new set of power quality\/harmonic filter device ( \u2018the Works\u2019)<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Stagno Tech Sdn Bhd<\/td>\n<td width=\"312\">Jabatan Kastam Diraja Malaysia, (2G1AB), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2013<\/td>\n<td width=\"258\">KFM Holdings sdn bhd<\/td>\n<td width=\"312\">Prime Minister Office, Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">KFM Holdings sdn bhd<\/td>\n<td width=\"312\">Dataran Maybank (Etiqa), Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">KFM Holdings sdn bhd<\/td>\n<td width=\"312\">Etiqa Twins Building, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">KFM Holdings sdn bhd<\/td>\n<td width=\"312\">Etiqa Academy , Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">CNNS Technasco sdn bhd<\/td>\n<td width=\"312\">Menara Maybank, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">CNNS Technasco sdn bhd<\/td>\n<td width=\"312\">Maybank Academy, Bangi<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">CNNS Technasco sdn bhd<\/td>\n<td width=\"312\">Maybank Data Centre, Shah Alam<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Telekom (M) R&amp;D sdn bhd<\/td>\n<td width=\"312\">Bangunan Kementerian Kemajuan Luar Bandar &amp; Wilayah (4G8), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Telekom (M) R&amp;D sdn bhd<\/td>\n<td width=\"312\">Bangunan Kastam &amp; Akuantan (2G1A &amp; 2G1B), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Greengineers sdn bhd<\/td>\n<td width=\"312\">Ampang Park Shopping Complex, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2012<\/td>\n<td width=\"258\">Telekom (M) R&amp;D sdn bhd<\/td>\n<td width=\"312\">Bangunan Kementerian Komunikasi &amp; Multimedia (4G9), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Mizura sdn bhd<\/td>\n<td width=\"312\">Parcel C, Putrajaya (7 buildings)<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Semasa Services sdn bhd<\/td>\n<td width=\"312\">Bangunan EPF, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Telekom (M) R&amp;D sdn bhd<\/td>\n<td width=\"312\">Bangunan Kementerian Luar Bandar &amp; Wilayah (4G8), Putrajaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Telekom (M) R&amp;D sdn bhd<\/td>\n<td width=\"312\">Bangunan Kementerian Perumahan &amp; Kerajaan Tempatan (4G10), Putrjaya<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2011<\/td>\n<td width=\"258\">Global Facilities Management Sdn Bhd<\/td>\n<td width=\"312\">Bangunan Sultan Iskandar, Custom &amp; Immigration Quarantine (CIQ), Johor<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2010<\/td>\n<td width=\"258\">Alpha Eight Tech sdn bhd<\/td>\n<td width=\"312\">KL Sentral &amp; 1 Sentral, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Prince Hotel<\/td>\n<td width=\"312\">Prince Hotel, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Park Royal Hotel<\/td>\n<td width=\"312\">Park Royal Hotel, Penang<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Seri Pacific Hotel<\/td>\n<td width=\"312\">Seri Pacific Hotel, Kuala Lumpur<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2009<\/td>\n<td width=\"258\">Radical Box sdn bhd<\/td>\n<td width=\"312\">TM Building, Kulim<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2008<\/td>\n<td width=\"258\">Nestle<\/td>\n<td width=\"312\">Nestle Plant, Chembong<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2006<\/td>\n<td width=\"258\">Green Productivity Foundation<\/td>\n<td width=\"312\">Taiwan Airport, Chiang Kai Shek, Taiwan<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2003<\/td>\n<td width=\"258\">Nagase &amp; Co Ltd<\/td>\n<td width=\"312\">Sony Factory, Kokubu, Japan<\/td>\n<\/tr>\n<tr>\n<td width=\"94\">2000<\/td>\n<td width=\"258\">Agilent Technologies sdn bhd<\/td>\n<td width=\"312\">Agilent Plant, Penang<\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><\/td>\n<td width=\"258\">Singapore General Hospital<\/td>\n<td width=\"312\">College of Medicine Building, Singapore<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n[\/mk_table][\/vc_column][\/vc_row]\n","protected":false},"excerpt":{"rendered":"<p>[vc_row fullwidth=&#8221;true&#8221; fullwidth_content=&#8221;false&#8221; css=&#8221;.vc_custom_1515594223110{padding-top: 60px !important;padding-bottom: 60px !important;background-color: #ffffff !important;}&#8221;][vc_column][mk_fancy_title size=&#8221;40&#8243; font_family=&#8221;none&#8221; responsive_align=&#8221;left&#8221;]Our Project Highlights[\/mk_fancy_title][vc_empty_space][vc_column_text css=&#8221;.vc_custom_1515602662768{margin-bottom: 0px !important;}&#8221;]Over the past 20 years, E-eye has been involved in numerous clienteles from medium to large scale organizations.[\/vc_column_text][vc_empty_space height=&#8221;50px&#8221;][vc_single_image image=&#8221;7917&#8243; img_size=&#8221;full&#8221;][vc_column_text css=&#8221;.vc_custom_1515602901565{margin-bottom: 0px !important;}&#8221;] Menara Telekom Implementation of Pumps Retrofit Savings of\u00a093 % of pumping kW\u00a0consumption was achieved [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-7937","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/pages\/7937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/comments?post=7937"}],"version-history":[{"count":11,"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/pages\/7937\/revisions"}],"predecessor-version":[{"id":7953,"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/pages\/7937\/revisions\/7953"}],"wp:attachment":[{"href":"https:\/\/www.eeye.com.my\/main\/wp-json\/wp\/v2\/media?parent=7937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}